Expenses in Modules
In Darwin, expenses represent costs that are real, recurring, and necessary —
but are not materials or labor.
They capture the “everything else” that makes construction possible: permits, stipends, logistics, mobilization, inspections, and similar items.
Modeling expenses correctly is essential for realistic estimates.
What Are Expenses?
Section titled “What Are Expenses?”Expenses are non-material, non-labor costs that are associated with a module or scope of work.
Common examples include:
- Permits and fees
- Mobilization and demobilization
- Stipends and allowances
- Temporary facilities
- Transportation and logistics
- Site access or inspection fees
- Environmental or regulatory charges
These costs often depend on context, not quantities alone.
Why Expenses Belong Inside Modules
Section titled “Why Expenses Belong Inside Modules”Expenses are rarely isolated line items.
They usually belong to a specific scope of work: a foundation module, a structural package, an MEP assembly, etc.
By placing expenses inside modules:
- Costs stay tied to their technical scope
- Reuse becomes consistent across projects
- Estimations remain complete and realistic
- Future estimates can reuse reviewed expense logic
Modules become full representations of how work is actually delivered.
Types of Expenses in Darwin
Section titled “Types of Expenses in Darwin”Darwin supports multiple ways to model expenses, depending on how the cost behaves.
1. Amount Expenses
Section titled “1. Amount Expenses”Amount expenses use a coefficient × unit price. Inside a module, their charge basis decides whether they apply once per module occurrence or scale with the module quantity.
Examples:
- Permit fee
- Inspection fee
- One-time mobilization cost
Example:
- Building permit → $2,500
- Site inspection → $800
Use PerModule for a one-time amount and PerUnit when the amount scales with module quantity. Entering “$2 per m²” as PerModule charges $2 in total, not $2 for every m².
2. Percentage-Based Expenses
Section titled “2. Percentage-Based Expenses”These expenses scale relative to the cost of materials, labor, or the entire module.
Examples:
- General overhead
- Insurance
- Contingency
- Administrative fees
Example:
- Overhead → 5% of materials + labor + amount expenses
- Insurance → 2% of labor cost
This is useful when the expense grows as the scope grows.
Each expense type has one of seven calculation codes:
| Code | Calculation |
|---|---|
A |
Amount: coefficient × unit price |
D |
Direct amount: coefficient × unit price |
S |
Subcontract amount: coefficient × unit price |
T |
Percentage of materials + labor + amount expenses in its scope |
M |
Percentage of materials in its scope |
L |
Percentage of labor in its scope |
E |
Percentage of amount expenses in its scope |
Percentages do not compound on other percentages. A module expense uses its module’s scope; standalone direct percentage expenses use standalone direct lines, while indirect percentage expenses use estimate direct totals (T also includes indirect materials, labor, and amount expenses). All seven codes use the Expense margin, including M: a percentage of materials is still an expense.
3. Distance-Affected Expenses
Section titled “3. Distance-Affected Expenses”Some expenses depend on project location or distance.
Examples:
- Transportation of crews
- Per diem or stipends
- Equipment hauling
- Remote site logistics
When an amount expense is linked to a Transportation Rate, its unit price includes rate per km × distance. Review that rate and project distance before relying on the amount.
This allows the same module to behave differently depending on where the project is executed.
Choose the Module Expense Charge Basis
Section titled “Choose the Module Expense Charge Basis”Choose the charge basis on each recipe line in the module editor:
| Basis | What the estimate charges | Example at 100 m² |
|---|---|---|
| PerModule | coefficient × unit price, once per module occurrence | $200 mobilization remains $200 |
| PerUnit | coefficient × unit price × module quantity | $2 haulage per m² becomes $200 |
Manually added lines default to PerModule. Material-linked and AI-generated lines default to PerUnit, because their coefficients are per module unit. Review those defaults before saving.
Existing expense lines kept PerModule when charge basis was introduced; their totals were not changed automatically. Review older recipes that were intended as per-unit costs. Changing a catalog recipe does not change an existing estimate on an ordinary save; explicit recalculation picks up the reviewed changes.
Inside a composite/bundle, each bundle unit contains an occurrence of its child modules, so both kinds of child expense scale with bundle quantity. When merging modules, PerModule amounts are added once and PerUnit coefficients scale with the selected source quantities; source modules stay unchanged.
Read Fixed and Variable Costs
Section titled “Read Fixed and Variable Costs”Fixed/Variable describes whether a cost scales with the owner’s quantity. It is separate from Direct/Indirect, which describes cost nature.
- Materials, labor, and PerUnit amount expenses are variable.
- PerModule amount expenses are fixed relative to module quantity.
M/Lpercentage expenses are variable;E/Tsplit according to the fixed and variable parts of their base.- Fixed subtotal + variable subtotal equals the total.
- Effective rate is total ÷ quantity, including fixed amounts spread over that quantity. It can fall when quantity increases even though the variable unit cost stays the same. At zero quantity, unit rates are shown as —, not zero.
Use the fixed/variable breakdown when reviewing a quantity change. Composite rows scale with bundle quantity and therefore have no fixed component at that level.
Standalone Expense Pricing
Section titled “Standalone Expense Pricing”Standard / Lump Sum pricing mode applies to standalone expense lines, not module recipes. A standalone Lump Sum is charged once and has quantity 1. Module expenses use Standard pricing plus the charge basis described above. Percentage expenses use the ls unit; that unit does not itself decide cost behavior.
Typical Expense Examples in Real Projects
Section titled “Typical Expense Examples in Real Projects”Here are common patterns estimators model using expenses:
- Crew stipend → fixed daily amount, affected by distance
- Mobilization → fixed amount per project
- Permits → fixed per module or per project
- Logistics surcharge → percentage-based
- Remote site allowance → distance-adjusted
These costs are often forgotten in early estimates — Darwin ensures they’re consistently included.
How Expenses Behave Across Projects
Section titled “How Expenses Behave Across Projects”Once defined inside a module:
- Expenses are reused automatically
- Percentage logic remains consistent
- Distance rules apply per project
- Catalog changes become available to new estimates and explicit recalculation, not automatic updates to existing estimates
This is where Darwin reduces risk:
expenses stop being “remembered manually” and start being systematically applied.
Best Practices
Section titled “Best Practices”- Keep repeatable scope expenses inside modules; use standalone lines for project-specific costs
- Use fixed amounts for permits and one-time fees
- Check PerModule / PerUnit on every amount expense, especially older recipes and AI drafts
- Use percentages for overhead-type costs
- Use distance logic for logistics and stipends
- Review expenses carefully in your first project
- Benefit from reuse and consistency in future projects
Expenses and Reusability
Section titled “Expenses and Reusability”Expenses are part of why the second project is faster.
Once you’ve modeled:
- permits
- stipends
- logistics
- overhead
You don’t rebuild them — you reuse them.
Review the reused expenses against the project’s scope so you can identify anything missing or charged on the wrong basis.
Summary
Section titled “Summary”Expenses allow modules to represent real-world construction costs, not just quantities.
They account for:
- Context
- Location
- Scale
- Operational reality
By modeling expenses correctly, Darwin becomes a true cost intelligence system — not just a quantity calculator.
Next Steps
Section titled “Next Steps”- Review expenses in your first project modules
- Adjust them until they reflect reality
- Reuse them in your next project
- Observe how consistency and speed improve
Expenses are not an afterthought — they are part of the system.