Materials
Materials represent the physical components used in construction — concrete, steel, drywall, insulation, finishes, and hundreds of other building elements.
In Darwin, materials are foundational building blocks that feed into modules and ultimately form part of your estimation’s cost structure.
This page explains how materials work, how to create them, and how they integrate into the broader estimating workflow.
1. What Materials Represent
Section titled “1. What Materials Represent”Each material in the Catalog contains:
- Name and SKU
- Unit of measurement (m³, m², kg, units, etc.)
- Catalog reference price and currency
- Supplier and category
- Applicable tax rate and handling cost
Materials do not store quantities or prices for specific projects.
They are reusable definitions used by modules.
2. Why Materials Matter
Section titled “2. Why Materials Matter”Materials provide:
Consistency
Section titled “Consistency”Using predefined materials ensures that similar assemblies always reference the same definitions.
Traceability
Section titled “Traceability”You can see exactly which materials were used in each module and estimation.
Transparency
Section titled “Transparency”Material quantities flow from modules into the estimation breakdown automatically.
Flexibility
Section titled “Flexibility”If a material’s price changes, update the price list and explicitly recalculate the editable estimate that should use the new price. Other estimates and approved baselines do not silently change.
3. How Materials Are Used in Modules
Section titled “3. How Materials Are Used in Modules”Modules use materials to define construction logic.
For example, a Concrete Slab 15cm module might include:
- 0.15 m³ of concrete per m²
- 12 kg of rebar per m²
- 0.01 m³ of formwork material
- 1 sheet of vapor barrier per 10 m²
When this module is added to an estimation:
- the IFC or manual quantity multiplies the material quantities
- the price list applies the cost
- the summary shows the material breakdown
This creates a transparent and audit-ready cost structure.
4. Creating a Material
Section titled “4. Creating a Material”To create a new material:
- Go to Catalog → Materials
- Click New Material
- Enter:
- name and SKU
- unit from the standard selector — see Units of Measure
- category and supplier
- reference unit price and currency
- tax rate and handling cost; check the defaults
- Save the record
- Update its price in the Price List
Open the saved material and check its unit, supplier, currency, and price. Editing this record changes the shared catalog. For project pricing, inspect its Price List and the estimate’s already-used basis.
5. Editing Materials
Section titled “5. Editing Materials”You can modify a material’s:
- name
- unit
- category
- documentation
These changes affect all future uses of the material.
The catalog allows a reference price to be maintained. Project prices are reviewed in the project’s Price List; editing a material does not automatically replace an estimate’s stored prices. Recalculate an editable revision when you intend to refresh its basis.
To load several materials, download the bulk-upload template, validate rows, and fix errors before importing. A list that fails validation creates no materials. After validation, upload processes rows individually and can report individual failures: inspect results before retrying. This imports materials, not estimates into modules.
6. Material Categories
Section titled “6. Material Categories”Darwin supports a hierarchical category structure that helps organize large catalogs.
For example:
- Concrete
- Structural Concrete
- Lightweight Concrete
- Masonry
- Blocks
- Bricks
- Finishes
- Paint
- Plaster
Categories improve searching and filtering, especially for large module libraries.
7. Best Practices
Section titled “7. Best Practices”Use clear and specific names
Section titled “Use clear and specific names”Avoid generic labels like “Block.” Prefer “Concrete Block 20cm.”
Keep units consistent
Section titled “Keep units consistent”If a material is usually sold in m², don’t switch to units arbitrarily.
Document assumptions
Section titled “Document assumptions”If a material has variants (e.g., fire-rated drywall), note it clearly.
Distinguish reference and project prices
Section titled “Distinguish reference and project prices”Maintain catalog reference prices and review the project’s Price List before recalculating.
Reuse materials across modules
Section titled “Reuse materials across modules”This improves consistency and simplifies updates.
8. Next Steps
Section titled “8. Next Steps”Continue exploring the Catalog:
- ➡️ Labor
- ➡️ Categories
- ➡️ Modules