Labor
Labor represents the workforce required to build each construction assembly — masons, carpenters, electricians, steelworkers, equipment operators, helpers, and other trades.
In Darwin, labor is defined in the Catalog and used inside modules to create predictable, reusable cost structures.
The recipe records how much work each unit requires; the Price List lets you review the rates the project will use on recalculation.
1. What Labor Represents
Section titled “1. What Labor Represents”Each labor entry contains:
- Trade name (e.g., Mason, Carpenter, Electrician)
- Reference rate, unit, and currency
- Description of the work and what the rate includes
Labor definitions do not store quantities.
Quantities are stored inside modules or calculated from project input.
2. Why Labor Matters
Section titled “2. Why Labor Matters”Labor is one of the most variable components in construction estimating.
Using structured labor definitions ensures:
Consistency
Section titled “Consistency”The same trade uses the same base assumptions across all modules.
Transparency
Section titled “Transparency”Users can see exactly which trades are involved in an assembly.
Adaptability
Section titled “Adaptability”Labor rates change frequently — Darwin updates them through price lists.
Traceability
Section titled “Traceability”Revisions, audits, and team handoffs become easier when labor is standardized.
3. How Labor Works Inside Modules
Section titled “3. How Labor Works Inside Modules”Modules combine materials, labor, and expenses to represent how something is built.
The labor portion defines how many hours of each trade are needed per quantity of output.
For example, a Masonry Wall 20cm module might include:
- 0.25 hours of Mason
- 0.10 hours of Helper
- 0.05 hours of Plastering Labor
When mapped to the project (IFC or manual quantity):
Estimated quantity × labor hours × labor rate = Labor cost
The catalog holds a reference rate. The estimate uses its pinned price basis; Recalculate refreshes rates from the project’s current Price List or, if none is assigned, the catalog.
This creates a clean separation:
- modules define logic
- price lists define cost
- estimations combine both
4. Creating a Labor Entry
Section titled “4. Creating a Labor Entry”To create a new labor definition:
- Go to Catalog → Labor
- Click New Labor
- Enter:
- trade name
- description of the work and what the rate includes
- reference rate and currency
- unit from the standard selector, such as hour, day, or m²
- Save the record
- Set or update its hourly rate in the Price List
5. Editing Labor
Section titled “5. Editing Labor”You can edit:
- trade names
- descriptions
- reference rate, currency, and unit
These changes apply across all modules that reference this trade.
For project rates, use Price Lists → Labor and recalculate an editable revision. Editing the shared catalog does not rewrite existing estimates’ stored rates.
6. Search Before Creating
Section titled “6. Search Before Creating”Search by trade name and check unit and description before adding another record. The labor catalog has no separate category, crew-composition, or wage-burden field. Describe what the rate includes and keep productivity in recipe quantities.
7. Productivity and Notes
Section titled “7. Productivity and Notes”Darwin allows you to store productivity assumptions indirectly through module definitions.
If a trade requires special considerations, you may document them in:
- labor entry description
- module notes
- project documents
Examples:
- “Crew is assumed to work with scaffolding.”
- “Productivity based on typical block installation speed.”
- “Requires two helpers for every mason.”
Clear documentation helps teams stay aligned.
8. Best Practices
Section titled “8. Best Practices”Use specific trade names
Section titled “Use specific trade names”Prefer “Drywall Installer” over “General Labor.”
Distinguish reference and project rates
Section titled “Distinguish reference and project rates”Check currency, unit, and what each rate includes. Review the project’s list before recalculating.
Reuse labor consistently across modules
Section titled “Reuse labor consistently across modules”Avoid duplicating labor trades unless absolutely needed.
Document assumptions
Section titled “Document assumptions”Especially for complex trades like formwork or rebar installation.
Review labor periodically
Section titled “Review labor periodically”Rates and productivity often evolve with market conditions and team experience.
9. Next Steps
Section titled “9. Next Steps”Continue exploring the Catalog:
- ➡️ Categories
- ➡️ Materials
- ➡️ Modules

